SNEA Meeting with Joint Secretary Admin, DoT exclusively on
issues related to Upgraded Standard Pay Scale of affected Executives in BSNL: In continuous persuasion by SNEA with all
relevant officers within BSNL and in DoT and with kind intervention of
Honourable MoC & MoSC on our submissions thereof, SNEA was called for
discussion and the presentation on our long pending demand and non-settled
issue of upgraded Standard Pay Scales for affected Executives in BSNL. This
meeting was held at Sanchar Bhavan, New Delhi on 04/06/2026 at 1600 Hrs.
The meeting was chaired by Shri. K. Balaji,
IAS, Joint Secretary Admin DoT in presence Shri. Raiti Madhav Rao, Director
PSU, DoT and from SNEA this meeting was attended by Ms. Anu Agrawal, Circle
Secretary, BSNL Corp Office Delhi and Shri. M. S. Adasul, General
Secretary.
At the outset we conveyed thanks to Joint Secretary
Admin for understanding the intensity of the issue and giving us time for
submission of issues faced by the affected Executives in BSNL.
Shri K. Balaji, Joint Secretary Admin, informed
that this meeting is called to know more details about the submission of SNEA on
demand of Standard Pay Scales in BSNL and how the issue is still unresolved and
affecting the workforce of BSNL and what are possible ways by which issue can
be resolved.
We submitted that entire information collected,
analyzed, researched, understanding the real issues faced and ways forward to
resolve this long pending dispute for justice to affected Executives. We have
submitted the Power Point Presentation and elaborated the entire actions on
part of BSNL, DoT and DPE. Copy<<<>>
We explained the Power Point Presentation
slide by slide and explained how issues are created and not resolved for years
together.
In its notification for second PRC issued in
2008 for its applicability from 01/01/2007, DPE has directed Administrative
Ministries and CPSEs to go ahead with only Standard Pay Scales notified by DPE
and existing intermediate Pay Scales if any are to be suitably upgraded to next
Higher Scales and for BSNL it was to be settled with upward E2 Pay Scale as per
directions of DPE. Copy<<<>>
This DPE OM was endorsed by DoT and in its
response instead of submission of proposal for E2 Scale, BSNL has submitted the
same proposal for continuation of E1A Pay Scales as since formation of BSNL,
the JTOs & JAOs were recruited at Pay Scales of E1A.
These Scales were widely accepted at that time
and BSNL was hopeful that the administrative Ministry DoT will surely approve
continuation of intermediate Pay Scales E1A & E2A. But DoT has rejected this
proposal in January 2011 stating that E1A and E2A pay Scales are not justified.
Copy<<<>>
Then by keeping aside earlier rejection, BSNL
again sent the proposal for reconsideration and approval of E1A Pay scales for
all JTOs/JAOs and this time DoT has taken up this issue with DPE. Important
point here is that DPE has clearly mentioned that as the Administrative
Ministry, Dept. of Telecom, do not agree with this proposal and hence DPE also
do not agree with it and DoT conveyed the same decision to BSNL. DoT <<<>> DPE <<<>>
We further explained that in order to address
the urgency of the contempt case filed at that time, DoT has lowered the
existing Pay scales and instead of settling the demand for replacing E1A with E2
Pay Scales and E2A with E3 Pay Scales, the pay scales are reduced to E1 &
E2. Instead of following guidelines of DPE, this time DoT issued Presidential
order Dated 28/03/2017. Copy<<<>>
From this order it is clearly visible that
instead of justice to the affected executives by approval of existing Pay Scales
or approving upgraded Standard Pay Scales, DoT has lowered the pay scales from
E1A to E1 and E2A to E2.
But as one time settlement, allowed the E1A
Pay scales for all existing JTOs/JAOs who were already getting E1A Pay Scales
i.e.
· JTOs/JAOs who joined BSNL with
absorption from DoT
· JTOs/JAOs who joined BSNL on
recruitment or promotions till 31/12/2006
· E1 Pay Scales for JTOs/JAOs who
joined BSNL on or after date of Presidential Order 28/03/2017.
· But nothing has been mentioned in
this PO about JTOs/JAOs who joined BSNL from 01/01/2007 to 27/03/2017.
We explained that all JTOs/JAOs joined after
01/01/2007 are still financially affected as the request by BSNL for upgraded
Standard Pay Scales for the JTOs/JAO joined since 01/01/2007 is not settled
since the last 16 years.
Since then DoT and BSNL management are sharing
that the issue is resolved with PO Dated 28/03/2017 and hence attained it
finality for ever and the issue is declared as closed by DoT even after
repeated reminders by BSNL.
We submitted copies of all the letters written
by BSNL confirming that the PO Dated 28/03/2017 is not giving justice to
affected JTOs and hence needs corrective action. Copy<<<>>
Unfortunately, it is assumed by DoT that this
PO dated 28/03/2017 is implemented by BSNL and we explained how it is not
implemented by BSNL and how DoT has called the status of implementation of this
PO from BSNL.
We added that SNEA earlier through meetings
with DyCLC and later on with different levels at DoT kept pursuing this issue
and even reached higher Officers/Offices including DPE and during meetings with
Honourable MoC & MoSC. First time in meetings of Conciliation Proceedings
by DyCLC, it was agreed by BSNL and DoT that this PO Dated 28/03/2017 for
settlement of Pay Scale issue of BSNL was not implemented for six years as
there is nothing to implement and it was principally agreed by DoT also that issue
of settlement of 2nd PRC issues is under consideration. Copy<<<>>
We also shared the information about the
resolution of similar issues faced by other PSUs and how the efforts also done
by BSNL, DoT and DPE for settlement of this issue in BSNL and how it in
non-conclusive as the final PO issued by DoT has nothing to implement and how
instead of passing benefits to any of the affected JTOs/JAOs how there will be
recovery of some of JTOs/JAOs. Copy<<<>>
We highlighted how directly recruited young executives
of BSNL with higher qualification of M. Tech, B. Tech and professionals with
CS/CA, legal degrees including GATE recruited executives working at forefront
are facing High losses in monthly salary and hence all affected JTOs/JAOs are
under huge frustration.
We added that non-approval of upgraded Pay
scales by DoT has resulted in resentment and demotivation amongst these
executives still they are not leaving any stone unturned in achieving targets
and making BSNL profitable.
We added that with our persuasion with then
Secretary DoT and then Joint Secretary Admin, it was principally agreed and
till now more than 10 meetings were conducted between the officers in
Establishment Cell of BSNL and then Joint Secretary Admin DoT. Accordingly
information has been called by his office from BSNL which is yet to be
submitted by BSNL.
Joint Secretary Admin Shri. K. Balaji,
responded that he is aware about the calling information from BSNL, but he
wants to know the issues faced by BSNL Executives and what is justification in
continued submission by SNEA on this issue and then he asked some queries and
the same were responded by us.
Joint Secretary Admin specifically asked that
in the last letter from DoT to BSNL it has been mentioned that this issue
cannot be settled as it has cascading effect and asked for a factual position.
We narrated that in letter Dated 06/06/2016,
BSNL has demanded for Cascading effect Copy<<<>> and the same was not agreed by DoT and vide
letter Dated 09/08/2016 it has informed BSNL that due to huge financial burden
of Pension under demand of cascading effect, the proposal cannot be acceded. Copy<<<>>
In response, BSNL has changed its stand and informed
DOT vide letter dated 12/06/2017, it is clearly submitted that Part I of Letter
dated 06/06/2026 for up gradation of E1A & E2A Intermediate Pay Scales is
to be implemented and Part II demanding cascading effect will be decided while
implementation of third PRC. In this letter under point (v) and (vi) requesting
for approval of up gradation of existing intermediate Pay Scales E1A and E2A by
Standard pay Scales E2 and E3 Pay scale and limited its demand only for
affected JTOs/JAOs Copy<<<>>
We specially submitted that BSNL has only two
intermediate pay Scales E1A and E2A and all other Pay scales are standard and
there is no any such issue as faced by JTOs/JAOs who have joined BSNL after
01/01/2007 and nothing like cascading effect.
As such, there is no cascading effect, but
unfortunately the same is being repeatedly mentioned by DoT including the
letter dated 28/04/2022. DoT <<<>> BSNL <<<>>
We submitted that with all this it is crystal
clear neither BSNL nor SNEA is demanding for cascading effect by up gradation
of all pay scales and we are repeatedly requesting for approval of upgraded
Standard pay Scales as replacement of intermediate E1A and E2A Scales by
upgraded Standard pay Scales E2 and E3.
We added that here the issue is not for
upgradation of pay scales of all cadres and issue is restoration of lowered pay
scales of affected JTOs/JAOs and there is no direct relation as other
executives are getting due benefits and their pay scales were never reduced and
hence there is no cascading effect.
Joint Secretary Admin informed that there are
some court cases and how this issue can be settled when matter is sub-judice.
We added that due to the prolonged time of 17 years taken by DoT for approval
of upgraded Standard Pay Scales, some affected JTOs/JAOs and some groups have
approached different courts, but no court has stayed any action by BSNL or DoT.
Rather guidelines issued by DPE are crystal clear and hence these cases are admitted
and heard by different Honourable Courts.
We added that it is important that in many of
the court cases decided till now it has been agreed for approval of Standard
Pays Scales and DoT also has responded to it by approving lowered Standard pay
Scales against repeated requests of BSNL and SNEA for approval of upgraded
Standard Pay Scales and this is issue to be decided.
We added that once the upgraded Standard Pay
Scale E2 is approved by DoT for all JTOs/JAOs in BSNL then about all the Court
cases on this subject will be settled/closed as their prayer in court cases is
considered. This will save lakhs of rupees of DoT, BSNL and the affected
executives.
Joint Secretary Admin informed that DoT has
repeatedly written to DPE but DPE has not agreed to this demand. We submitted
that first matter was raised by DoT to DPE in 2013 and DPE has clearly
mentioned that this demand of approval for continuation of E1A Scales cannot be
approved as the same is not agreed by administrative Ministry DoT. It clearly
demonstrates that if DoT had recommended continuation of E1A Pay scales for all
JTOs/JAOs, this Pay Scale issue would have been settled with approval of the
DPE.
We submitted the copy of the DPE letter dated
24/12/2012 Copy<<<>> wherein it is clearly
mentioned that the corresponding Standard Pay Scales cannot be altered by CPSE
and CPSEs cannot have more than one pay scale in a grade, but the same are
violated in DoT PO Dated 28/03/2017.
We added that on demand of Standard E2 &
E3 Pay Scales by BSNL, DoT has taken up matter with DPE and in response DPE
vide OM Dated 29/08/2018, has delegated powers to the Administrative Ministry
to settle this issue of intermediate Pay Scales stating actual implementation
of the DPE guidelines rests with the CPSEs in consultation with their
Administrative Ministry/Dept. Copy<<<>>
We are thankful that DoT has earlier taken
decision by issuing PO dated 28/03/2017, which is non-implementable as the part
of implementation is missing in this Presidential Order and hence there is need
of revised Presidential Order purely for approval of upgraded E2 & E3 Pay
Scales for affected JTOs/JAOs and SDE/AOs in BSNL.
We further submitted that as per this DPE
letter, BSNL Board has approved Upgraded Standard pay Scales and CMD BSNL has
submitted the proposal for approval of E2 and E3 Pay scales as replacement of
earlier E1A now E1 to E2 and earlier E2A now E2 to E3 and the final decision is
to be taken by DoT which we have been pursuing for the last many years.
Joint Secretary Admin asked the number of
executives affected and what exact financial issues they are facing. We
responded that there are about 15000 executives in BSNL i.e. 50% of total
executives in BSNL are affected due to pendency of approval of upgraded E2
Standard pay Scales. We submitted the batch wise list of executives and how it
is directly impacting on concerned executives. Copy<<<>>
Joint Secretary Admin informed that DoT has
already extended financial support and it cannot extend support for
settlement of this issue and BSNL cannot bear this due to its financial
constraints. We responded that this was the old issue of Year 2007, when BSNL
was in profit and hence there is no any such issue. If E1A Pay Scale as
proposed by BSNL or E2 Pay Scale as directed by DPE/DoT were continued along
with other pay scales subject to final approval of DoT, then there would not be
an issue as being projected now. During actual approval time, BSNL was in
profit and hence 2nd PRC was approved for all and this Pay Scale
issue is part of second PRC implemented from 01/01/2007. Hence there is no
issue of financial constraints. We also added that BSNL has never asked
financial support from DoT for this issue and in each & every letter it
is clearly mentioned by BSNL that this issue will be settled from the internal
sources.
Joint Secretary Admin asked what the total
financial implication is and how it can be justified in present
circumstances. We responded that upgraded E2 Standard pay scales will add
merely Rs 7.5 to 9 Crores per month and about Rs 90 to 100 Crores per year and
detailed figures are already submitted by BSNL officers in our meeting with
then Joint Secretary Admin and the same was confirmed by Director PSU.
We added that the issue is of the JTOs/JAOs
recruited after 01/01/2007 and all are presently working in the front line in
field units all over India including odd and remotest places. They are directly
facing and independently dealing with all the operational and development works
and issues of BSNL. By considering this, BSNL Board has approved this demand
and the same is strongly recommended by CMD BSNL well within the guidelines
issued by DoT & DPE.
Important point is that though it was
initially rejected by DoT at two occasions, later it is partially agreed by DoT
by issuing PO dated 28/03/2017 and thereafter also BSNL has continuously
requested for settlement of this long pending issue by approval of E2 pay
Scales for all JTOs/SDEs.
Joint Secretary Admin asked about the date
of effect of these upgraded Standard Pay Scales. We submitted that this is
not new issue and it is an old issue decided at BSNL and DPE long back, DoT
also has decided this issue partially on 28/03/2017, but this temporary
arrangement of settlement of issues does not cover the affected JTO and hence
still not implemented. As such, this old issue of 2007 and its implementation
is naturally from 01/01/2007 i.e. the date since this issue was created.
Joint Secretary Admin asked what if the earlier
proposal for continuation of E1A & E2A Scales is approved for entry
level executives in BSNL. We submitted that BSNL has already demanded for the
same, but not approved by DoT and when BSNL demanded for E2 pay scales, then
DoT has approved E1A pay scales that to be partially and not for affected JTO
/JAOs and hence issues. WE also added that DPE has never agreed for E1A
Intermediate Pay scales and now also it may not agree. Further, approval of E1A
scales for all JTOs /JAOs will not solve this problem to root cause, as BSNL
has already granted batch to batch fixation viz. E1 plus five increments, 19020,
21620, 22080 basic to many of JTOs /JAOs and their grievances will not be
resolved with E1A Pay scales and disparity will continue. Hence the upgraded
Standard Pay Scale E2 should be approved for all JTOs/JAOs joined in BSNL from
01/01/2007 to till today.
Joint Secretary Admin asked about the proposal
by SNEA for settlement of this issue once for all and we submitted that if DoT
conveys approval for request of BSNL for approval E2 Pay Scales for affected
JTOs and JAOs in BSNL then the issue will be resolved to its root cause and
this will be justice to all JTOs/JAOs in BSNL. We added that with all
correspondence between BSNL, DoT and DPE this is the only solution as of today.
Joint Secretary Admin asked why this issue is
pending for these many years and it was not raised earlier. We explained how
this issue is repeatedly taken by BSNL management and SNEA also is continuously
pursuing this issue and we submitted all our correspondence on this subject
matter and also submission by BSNL Management. We added that with continuous
persuasion by SNEA more than 10 rounds of discussions are held till now by then
Joint Secretary Admn on this subject in presence of officers in BSNL and now it
needs his kind intervention for resolution of this issue.
Joint Secretary Admin also made some other
queries and we have replied to all these queries with supporting documents.
After elaborate discussions, we submitted our
prayer for consideration of BSNL Request for upgraded Standard Pay Scales E2
for all JTOs/JAOs in BSNL and justice to the thousands of affected executives
in BSNL.
Joint Secretary Admin appreciated the presentation
and detailed submission by SNEA and expressed that the desired information has
been received by him and assured necessary action for settlement of this issue.
In conclusion of the meeting which lasted for
one hour, Joint Secretary Admin asked Director PSU to pursue with BSNL for the
information called from BSNL and ensure that the same is received at the
earliest and directed re-process the proposal on receipt of information called
from BSNL.
We conveyed thanks to Shri. K. Balaji,
Joint Secretary Admin and Shri. Raiti Madhav Rao, Director PSU for
giving ample time for understanding this long pending issue and requested for
approval of upgraded Standard Pay Scales for all affected Executives.
In view of
positive discussions and firm assurance from CGM UTKD, and in view of scheduled
AUAB CHQ Meeting at Delhi, AUAB Uttarakhand deferred the ongoing agitational
call. Copy<<<>>
AGM Pers
BSNL CO writes of all Circle Heads conveying extension of timeline for Initiation
& submission of self-appraisal till 11/07/2026, reporting period up to 15/07/2026
and reviewing period up to 31/07/2026 in Processing of e-APARs of FY 2025-26 through
online through ESS Portal. Copy<<<>>
June 2026
Edition: Special Message of Honourable Minister
of Communications & DoNER Shri Jyotiraditya M. Scindia ji. Copy<<<>>
DGM Estt
BSNL CO writes to all Circle Heads regarding Calling for volunteers among JTOs
in Telecom wing for filling up the post of Technical Assistant in the National
Technical Research Organisation on deputation on short-term contract basis. Copy<<<>>
Protest against
Absurd Restructuring Proposal: The
order issued by PGM Restructuring BSNL CO has created mass unrest among the
executives and employees of BSNL and as immediate action all the employees and
executives of Uttarakhand Circle have started Agitational Programme throughout
Uttarakhand Circle. Copy<<<>>
By
taking serious note of unrest among the BSNL workforce by damaging actions by
the BSNL Management on name of restructuring, the leaders of All Unions and
Associations of BSNL at Uttarakhand Circle issued notice for agitational
Programme by all the Executives and Employees of Uttarakhand Circle.
After analysing
the Restructuring order and taking serious note of issues created in this
order, Shri. M.S. Adasul, GS SNEA, Shri Arvind Pal Dahiya, JSC
SNEA CHQ along with Shri. R.K. Gupta, GS DEWAB had meeting with Shri.
A. Robert J. Ravi, CMD BSNL and Dr Kalyan Sagar Nippani, Director HR
BSNL wherein we have registered strong protest against the proposal for posting
JTOs and SDEs at Gram Panchayat and Block level on name of pilot restructuring
project for UTKD Circle and narrated all other issues created by this absurd
order.
We have
narrated how this proposal is prepared on fake grounds and false assumptions
and how this is a non- implemental proposal.
Both CMD
BSNL and Director HR informed us that this is just a pilot project to be
implemented in a small circle and views of Associations will be given
consideration before going ahead with the proposal. After our detailed
submission, CMD BSNL has directed us to submit details and discuss all the issues
related to Restructuring with the PGM Pers/SR/Restructuring and he will discuss
with PGM Pers after feedback from all.
CMD BSNL
assured us to take care of grievances as per submission of Associations and has
again informed us that the restructuring proposal for Uttarakhand Circle is
just a pilot project and this will be finalized after consultation with all.
Thereafter
this delegation along with Shri. N.D. Ram, Chief Patron SEWA and Shri.
Lokendra Ganolia AGS SEWA CHQ had a meeting with PGM Pers/SR & Restructuring
and we have detailed discussions for more than one hour wherein we have
elaborately stressed on issues created by this absurd order. PGM Pers/SR/RSTG
was initially of the opinion that there is nothing wrong in this proposal for pilot
Circle and the issues faced will be studied by CGM Uttarakhand Circle and then
decision will be taken for its implementation in Uttarakhand Circle and other
Circles. We expressed serious concern that in a similar manner management was
assuring about the defunct and defective SET recruitment Process and silently
conducted SET examination. Similar cheating is also possible in this case and
we demanded for immediate withdrawal of this absurd proposal. PGM asked for
suggestions for improvement in it and assured for its review as per the
suggestions. We strongly objected to restoring reporting of JTOs to SDEs which
has been stopped by BSNL for the last ten years and all of sudden such proposal
is processed for posting SDEs in Block and JTO is Gram Panchayat level. PGM
Pers informed that JTOs will be posted at Block level and they will have to
take care of on an average 57 Gram Panchayat and search for business opportunities
in these areas.
We informed
PGM Pers that about all landlines are closed by BSNL, all line staff is given
VRS and now JTOs are being posted to look into the Connections of BBNL. We
expressed serious concern over under utilisation of talent of BSNL Executives
and employees by transferring them from areas having much business to areas
having no business.
We made
it clear that BSNL management is beating bushes as the actual problem is non-availability
of desired backbone bandwidth, old OF Cable laid before 20 to 30 years and
faults thereof, non-availability of minimum required stores, uninterrupted
power supply, battery backup, supporting manpower, command taken by contractor by
taking Tenders at National level and deploying local contract workers at less
amount, frequent disruption of OFC Network etc are the real issues to be looked
into. But nobody talks about it and it is projected that due to non-availability
of JTOs at Gram Panchayat level, BSNL is facing loss.
We made
it clear that Management has to come with facts and do needful and stop giving
false information to DoT, MoSC and MoC. We also narrated that there is a need to
empower the field Officers by providing Financial powers, Vehicle for office
work, TA/DA as per the current rates and has to give minimum level support
required for maintenance of infrastructure, in which management has failed for
years together.
We specifically
narrated that SDEs and JTOIs in BSNL are deprived even from their due salary as
their pay scales are downgraded by the BSNL and its proposal for approval of
Upgraded Standard pay scales in not approved by DoT for last 17 years, and many
of them are forced to work at lower salary for years together as many of them
have not seen PRC since 10 to 17 years of their continued services in BSNL. Management
is not worried about HR issues and only forcing executives by creating such
extreme odd conditions. We also narrated that BSNL management has falsely
projected that there is no expenditure in this proposal but practically a huge
amount will be used in such mass transfers. We asked for the proposal showing an
increase in profit and revenue of BSNL, but the same was not made available. We
clearly told that it is difficult to convince executives further as they have
feelings of cheating by Management. One side management says that there is no
money for even petty issues of employees and on other side Crores of rupees are
being wasted by issuing mass transfers of executives and this idea will make
huge expenditure on transfer of each and every executive.
We asked
for justification on taking Gram Panchayat and Block as basis for deciding posting
when BSNL has already well defined guidelines to justify the post either on
available Infrastructure, line and network or revenue being earned, but it was
just informed that this is proposed by keeping focus on telecom business in
Gram Panchayat Area. We explained how this is a false assumption as Telecom business
opportunities are more in the urban area and revenue generated will be higher.
We also narrated
that one side management is making such a wrong proposal and increasing losses
of BSNL and on the other side we are denied PRC quoting losses which are due to
such useless proposals and told that we will not bear with such damaging actions
further.
We have
submitted detailed points which needs to be clarified for acceptability of this
proposal. Copy<<<>>
Only a few
points out of this list were responded to verbally by PGM Pers as he was called
by Director HR for some discussions.
We have
strongly demanded for withdrawal of this pilot proposal as it is prepared on
false and fake grounds and we have conveyed in clear words that if important financial
issues of BSNL workforce i.e. implementation of third PRC and approval of
upgraded Standard pay scales by DoT is approved, then we can discuss on this
proposal if management is able to justify that this proposal as revenue earning
proposal for BSNL.
On our
query, it was replied that the proposal is prepared without consultation to CGM
UTKD and the practical difficulties are not taken into consideration.
We have
categorically told that if the decision is not withdrawn, the agitational programme
started by AUAB Uttarakhand throughout the Circle will be intensified by AUAB by
launching agitational programme at all India Level and entire responsibility
lies with the management.
In
conclusion, PGM Pers informed that he will update these submissions to Director
HR, CMD BSNL Management and will also discuss with CGM UTKD to get feedback
after discussing the Unions and Associations in Uttarakhand Circle and then
further course of action for its review or withdrawal will be taken.
Meantime,
it is decided to conduct an urgent Meeting of AUAB CHQ on 08/07/2026 as other
General Secretaries will be reaching Delhi by this date and further course of
action by AUAB will be decided. Hope for the Best.
Absurd
Restructuring Proposal by BSNL Management:
PGM Restructuring BSNL CO has issued letter for restructuring of Uttarakhand
Circle as pilot Circle. Copy<<<>>
This letter
seems to be deliberately issued during the membership window so that unrest is
created among the Executives and under frustration of such activities by BSNL management,
some of them quit the membership of Associations and to increase the total
number of non-members of any association.
Management
is in extreme hurry that the proposal is posted on holiday and unfortunately
the same management does not get time for deciding posting of JTOs in
Electrical wing for their SDE Promotions for which DPC has been conducted and
process is completed before one month and every time it is being assured to
issue the Promotion order at the earliest, but not issues for last one month.
The intention
of this proposal is to project in front of DoT and Govt of India that the employees are
not working and hence they need to be punished by posting at remote places and Management
gets a good name in the eyes of the DoT, Honourable MoC & MoSC such an absurd
proposal is submitted and approved.
It is
unfortunate that none of the officers in the Management dealing with this Restructuring
proposal is understanding the practical requirement of BSNL and if
understanding nobody has the guts to speak the truth and hence such attempts of
beating bushes is done by projecting such utter useless proposals.
It is an
unfortunate situation in BSNL that nobody wants to speak reality and practical
requirements as if somebody speaks it, then he/she is either transferred to odd
places or harassed by different actions. Due to this approach, about all senior
officers have taken a stand to shut the mouth and in case if mouth is to be opened
then it is opened only join whatever is said by the higher officer in Chain.
This is the
reason, this absurd situation is witnessed in BSNL wherein proposals without
understanding practical requirements and needs of BSNL & its executives. Only
proposals given by BCG or generated from AI are being projected as
restructuring proposals for revival of BSNL and hence these are lacking practical
use and needs of BSNL.
One side
BSNL management is taking Credit that the revenue of BSNL has touched the
figure of 25000 Crores with base of just 50000 employees and on the other side
it is projected that employees are not working hence such extreme drastic steps
are required for revival of BSNL.
Otherwise
how such a proposal can be designed by the Committee headed by CGM BSNL with
Five PGM Level members, two working in field units and three from Corporate
Office and it is understood that this Committee was constituted secretly.
In BSNL
justification of posts is done on basis of Number of working LL/FTTH lines, Length
of OFC Network, Transmission Network, Mobile Network and Enterprise Business,
but here in a funny approach, the Committee has now justified the posts on basis
of number of Gram Panchayat and Blocks, which has lost relevance due
digital era and when geographical boundaries are vanished making world as one
platform.
Unfortunately,
it seems that the Committee, BSNL management and officers in DoT are either not
aware of this digital world and are taking BSNL and its executives back to the
world of ancient days where Gram Panchayat played an important role in local
markets.
It is
unfortunate that BSNL is given huge business at Biggest Metro Cities i.e. Delhi,
the Capital of India and Mumbai, the Economical Capital of India and here BSNL Management
is not thinking of utilisation of even a single officer/employee of BSNL and
even more than 3000 Executives/Employees of MTNL are forced to sit ideally without
giving proper work and nothing is done in the last two years to improve Telecom
services of BSNL either in Mumbai or Delhi and it is proposed to outsource all
services from procurement to maintenance to the Vendors and BSNL officers and
employees are forced to join at Rural areas that to be at Gram Panchayat level.
Forget
about these two big Metro cities, the other Metro cities, district places will
now be disturbed and now all the executives will be posted at Gram Panchayat
Level and Block level.
The said
committee and BSNL management is so blind that they are unable to differentiate
the needs and requirements among the different Blocks and Different Gram Panchayats
with geographical boundaries, areas covered, local conditions, hilly terrains
and any other factor as per needs and requirements of BSNL.
Its
seems this team is worried only about number of Gram Panchayats and Blocks and
has planned such absurd proposal focusing on Gram Panchayats and Block
forgetting needs of big /metro cities and opportunities of Business and revenue
for BSNL, otherwise such useless, absurd proposal destroying BSNL and its executives
further.
In
recent past, the prominent Circles like Kerala, Maharashtra, Karnataka and Gujarat
Circle also have issued restructuring norms at their level and they have reshuffled
staff as per these restructuring proposals. In contradiction to these orders by
major Circles, the proposal by Restructuring Cell is based on number of Gram
Panchayats and Blocks, this is how BSNL is being driven wrongly.
There
are many orders stating that JTOs will not report to SDEs and this has been accepted
by all in BSNL for last decade but now with u turn to this decision each and
every JTO will have to report SDEs as if the Committee and BSNL management is
not aware of this decision.
It is important
that the Management has falsely made the instructions of PMO vide letter Dated 29/01/2026
under point 10 as base for this justifying proposal and it is projected that
Respected Prime Minister of India desires that JTOs and SDEs needs to be posted
respectively at Gram Panchayat and Block levels. But if we go through the
instructions of PMO in this letter, under point 10, it is directed to take
immediate steps to repatriate all the officers on deputation to BSNL. Copy<<<>>
In the second
part of this point 10 it is mentioned that assessment of all personnel may be
carried out with regards to their suitability for the organisation and efforts
may be made to reduce the staff.
Thus it
is crystal clear that the instructions from the PMO office are different and
BSNL management is projecting it differently and making all out efforts to
destroy the present working of BSNL and disturbing each and every executive of
BSNL by mass transfers to Rural and Remote Areas that to be Gram Panchayat level
where there is no scope for growth of BSNL.
This and
other such decisions like SET recruitment from open Market neglecting internal
talent available in BSNL, Appointment of Contract basis GMs in Finance and
Telecom wing are against guidelines of PSUs and hence cannot be implemented in
PSU as there seems dilemma about which rules are to be applied to BSNL either
rules of PSU or rules of Govt and DoT/BSNL are selectively applying rules of PSU
and Govt as per their needs and not as per the needs of BSNL.
In last
two years, earlier different committees have been constituted which were having
CGMs as members, but these committees have submitted any report and this secret
committee has given report within no time and BSNL management and DoT also has
acted on this without in lightening speed as if they are in hurry to destroy BSNL
and its executives on name of Restructuring
SNEA condemns
this absurd decision of BSNL management for Transferring JTOs en masse at Gram Panchayat
Level and transferring SDEs en masse at Block level and also condemn decision to
scrap well settled and highly accepted OA/BA basic structure in BSNL working with
attempt of further reducing the sanctioned posts which are already reduced drastically
after Mass VRS by neglecting needs of BSNL.
SNEA will
oppose this proposal it till it is withdrawn in the interest of BSNL and Its
executives.

Highly
Successful Combined CEC Meeting of SNEA West Bengal & Kolkata Circle: {Report by Shri. Anup Mukharji Joint Secretary East CHQ}: With a Historic and Power-Packed Commencement,
the Combined CEC (Circle Executive Committee) meeting of SNEA West Bengal
Circle and SNEA Kolkata was held up with unmatched grandeur, roaring
enthusiasm, and a profound sense of solidarity on the 12th June 2026
at the Moulali Yuva Kendra Conference Hall, Kolkata, West Bengal.
The atmosphere was electric, charged
with the collective resolve of leaders and delegates who had gathered from
every corner of the West Bengal Circle.
Prior to this SNEA WB Circle successfully
held proceedings of first day of CEC
Meeting at same venue, wherein many internal issues were discussed in depth.
The historic occasion commenced with a
deeply inspiring flag-hoisting ceremony in morning hours. Shri. Amit Khan,
Circle President, SNEA West Bengal, proudly hoisted the SNEA flag amid
thunderous slogan-shouting that echoed the unity and steel resolve of SNEA.
Standing shoulder-to-shoulder in absolute solidarity were Circle Secretary Shri.
Somenath Ghosh, all Circle Office bearers, and a massive gathering of
district leaders and dedicated delegates, symbolizing the ultimate unity and
strength of the association.
Following the high-voltage flag hoisting
and slogan chanting, the leadership and delegates assembled inside the grand
venue. With the entire house standing on its feet and the dignitaries on the
dais, the conference formally commenced with the singing of the National Anthem
in a deeply solemn and befitting manner, setting a patriotic and high-spirited
tone for the mega event.
First Half of Joint CEC &
Internal Leadership Discussions: All
Circle Executives and District Executives of SNEA Kolkata and SNEA West Bengal
were duly present, marking full and vibrant attendance. In this exclusive
executive session, several core organizational agendas were placed on the table
and thoroughly debated.
Detailed
Agenda & Core Issues Tabled in the First Half: After elaborate
discussions on reports by DS and CS, the house passed the following
resolutions.
· Office
Infrastructure: Insisted on
strict implementation of the 2nd Saturday holiday across all OAs, provisioning
of dedicated Admin staff, and prepaid FTTH connections for offices.
· GeM
Hardware Issues: Reported
that PCs and hardware supplied through the GeM portal do not match the required
application profiles and technical specifications.
· The
Crucial Pay Loss Nexus (E1+5 & Standard E2): Strong emphasis was placed on the long-standing Pay
Loss issue, specifically highlighting the anomalies of the E1+5 scale. The core
demand focused on resolving this permanently by implementing the standard E2
pay scale for all JTOs and JAOs who joined after 2007. Alongside this, the
grievance regarding TTA Pay Loss was forcefully tabled for an early resolution.
· Implementation
of the 3rd PRC: A major
discussion centred on the implementation of the 3rd PRC for BSNL employees. The
leadership demanded that the corporate management clear all bottlenecks to
implement the pay revision at the earliest.
· DGM
Promotions: A dedicated
agenda was placed regarding the immediate dynamic implementation of
long-awaited DGM promotions, emphasizing the widespread frustration caused by
prolonged functional stagnation at higher management cadres.
· Strong
Objection to SET Exam: The
executive leadership placed a fierce and unanimous objection against the
implementation of the SET Exam for internal recruitments/promotions. Executives
expressed severe resentment, stating that such examinations undermine
institutional seniority and operational parity.
·
JTO
to SDE SCF: Demanded the
immediate clearance of JTO to SDE SCF promotions and a definitive revision of
the BSM Gratuity Slab for executives.
· VR
& Earned Leave:
Demanded immediate settlement of pending SPS cases and a 150-day EL encashment
benefit for BSNL executives under VR.
· SAB
& LIC Contributions:
Demanded that SAB contributions be managed directly by LIC and made completely
transparently visible on the LIC portal.
· Medical
& Welfare: Called for the
modernization of the BSNL Self-Care App, the inclusion of more ailments under
the Chronic Diseases list, and company-funded OTP communication channels.
· Allowances
& Rule-8: Raised issues
regarding Spouse Rule-8 transfers (Bihar) and strongly demanded the closure of
non-territorial circles.
· Rejection
of Kerala Model: Strongly
opposed the forceful implementation of the Kerala Telecom Model in West Bengal,
citing completely different regional realities.
· Asset
Leasing: Demanded that BSNL properties be leased
out to generate sustained revenue rather than being sold off outright.
· App Integration: Called for the immediate consolidation and integration of multiple Open Platform Apps (OPPs) and URLs to streamline workflows.
The house gave warm welcome to Shri. Anup Mukharji, Joint Secretary East CHQ and Shri. M. S. Adasul, GS SNEA GHQ.
One of the active leaders Shri.
Anisul Haque, presented beautiful Pen to GS and expressed gratitude for
efforts of SNEA in resolution of HR issues of BSNL Executives.
Thereafter Shri. M S. Adasul, General
Secretary delivered a critical guidance speech specifically addressed to the
leadership of BSNL Kolkata and West Bengal SNEA, outlining the national
strategic roadmap and advising on grassroots management before opening up the
floor for the day's primary agenda. In his two-hour address, he touched all
issues about working of Association at all levels, role and responsibilities of
SNEA leaders at different levels, steps taken by SNEA for betterment of the
executives and results thereof. After his address, house adjourned for lunch.
Second Half Proceedings: Grand Open Session & Leadership
Addresses: The
second half of the meeting witnessed a massive, spontaneous gathering of
general members who assembled in overwhelming numbers for this joint Circle
Executive Committee (CEC) session to welcome and hear the policy directions
from the central leadership.
The entire grand ceremony and CEC
proceedings were ably presided over and anchored by Shri. Amit Khan, President,
SNEA West Bengal, who kept the audience engaged with his masterful handling of
the session.
The open house was set in motion with a
fiery, powerful, and highly motivating speech by Shri. Prasoon Ghosh, President,
SNEA Kolkata, which instantly electrified the atmosphere. This was followed by
an excellent, high-energy, and deeply inspiring address delivered by Shri.
Harekrishna Fauzdar, Circle Secretary, SNEA Kolkata, who laid bare the core
challenges of the region. Adding to the momentum, Shri. Somnath Ghosh,
Circle Secretary, SNEA West Bengal, delivered a deeply dedicated, articulate,
and nice speech, reaffirming the circle's absolute commitment to the executive
movement.
Keynote
Report: Intervention by the Joint Secretary East, SNEA: Following the circle leadership, the
floor was taken by the Joint Secretary East, SNEA, Shri. Anup Mukherjee. The
address was delivered with deep organizational passion and piercing logic,
reflecting the core expectations of the general members who had shown massive,
voluntary attendance for CEC Meeting.
In the reporting, the following critical
issues were strongly placed before the house:
Massive Solidarity and Spontaneous
Presence: A warm organizational welcome was
extended to all field units for their overwhelming, spontaneous, and dedicated
participation across both days of the Circle Executive Committee (CEC) proceedings,
highlighting that this massive presence reflects the members' deep interest in
reshaping the future of BSNL.
Pay Loss Issue & Implementation of
E2 Related: The floor was
dominated by the critical Pay Loss issue. The management was strongly interrogated
over the highly anomalous E1+5 scale pay structure. It was forcefully demanded
that standard E2 pay scales must be implemented to protect the financial rights
of JTOs and JAOs recruited post-2007. Furthermore, the long-pending issue of
TTA Pay Loss was brought to the forefront as a matter of immediate priority.
The Struggle for 3rd PRC Implementation:
The delayed implementation of the 3rd
PRC was highlighted as a major source of resentment among the employees.
Management was fiercely questioned over the lack of active intent in
implementing the pay revision, which has severely impacted the morale of the
workforce.
Promotional Stagnation & Structural
Neglect: Grave concerns were expressed regarding
the deliberate delaying of JTO to SDE SCF promotions. The administration was
severely taken to task for keeping premier operational areas like Kolkata
starved of regular DGM, GM, and AGM leadership, alongside crumbling building
maintenance and the lack of basic amenities like drinking water at exchanges.
A clear and definitive roadmap was
requested from the central leadership to permanently resolve this
administrative deadlock and safeguard executive rights through constructive and
strong organizational representation.
Address
by General Secretary: The
session reached its ultimate crescendo when the General Secretary of SNEA, Shri.
M. S. Adasul, addressed the house. Delivered with profound statesman-like
gravity, the speech comprehensively answered the core issues, throwing the
entire hall into waves of thunderous applause and renewed optimism.
Resolute Stand on Pay Loss &
Standard E2 Scale: On
the critical Pay Loss issues that dominated the CEC discussions, the General
Secretary updated house about efforts taken by SNEA and the present status. He
confirmed that the battle for the implementation of the standard pay scale for affected
JTOs and JAOs is being keenly pursued at the highest levels of corporate
management to permanently replace the anomalous E1+5 structure. He also assured
the house that the TTA Pay Loss grievance has been taken up through Court and the
case filed by SNEA is listed for final hearing, but held up due to last minute
MA filed on similar lines, there killing important time of two years and is on
a definitive path to being systematically resolved.
Deep Structural Struggles & Strong
Optimism on HR Agendas: In
the opening phase of his address, the General Secretary firmly established that
the central leadership is locked in a fierce, uncompromising battle with
corporate management regarding promotions for all wings and cadres. He updated
house about status of each pending promotion across the different cadres and
wings. He expressed immense optimism
that relentless pursuance by SNEA will yield results soon as administrative and
legal bottlenecks are being successfully dismantled. Furthermore, he
highlighted his absolute commitment and highly optimistic outlook toward
implementing crucial policy decisions regarding rotational transfers, filling
structural leadership vacuums Executives in different cadres in Kolkata, and
extracting absolute mandates for building repairs and drinking water from the
Circle Office.
Comprehensive Deconstruction and Hopes for
Promotions: Elaborating
extensively on management stagnation, the General Secretary provided a
comprehensive and thorough explanation regarding the delay in DGM promotions.
After mapping out the intricate administrative bottlenecks and
counter-strategies by SNEA before the house, he expressed a very strong and
positive optimism that the DGM promotion issue is on the verge of a swift and
successful resolution.
Actions taken by SNEA in stopping
defunct and defective SET Recruitment: Addressing the deep resentment shared by the
executives, the General Secretary detailed the rigorous and intensive efforts
SNEA is making at the highest administrative levels to paralyze and cancel the
proposed SET Exam. He strongly condemned the attempt of management to force
direct structural recruitments via this channel and gave a rock-solid assurance
to the entire house that SNEA will successfully shut down this process
permanently.
Hope and Confidence on 3rd PRC
Settlement: Addressing the
crucial agenda of the 3rd PRC, the General Secretary expressed strong optimism
about breaking the current deadlock. He assured the members that SNEA is
leaving no stone unturned at the ministerial and corporate board levels to
expedite the pay revision. He requested all employees to maintain deep patience,
maintain absolute discipline, and place their full faith in the central
leadership as they navigate this complex negotiation toward a positive outcome.
System Overhauls & Operational
Relief: A categorical assurance was given that
the blind replication of the Kerala Model would be resisted at all costs. To
address immediate field grievances, deep technical synchronization with ITPC
has already commenced to debug the Sanchar Mitra app and replace defective GeM
hardware, while management is being legally pressured to deploy permanent staff
at CSCs to provide immediate relief to BBMs.
Optimistic Approach toward Local
Holidays & Welfare:
Turning to regional operational concerns, the General Secretary stated that
while a final corporate mandate on the 2nd Saturday holiday and Special CL is
still a matter of ongoing discussion, the leadership is highly optimistic. SNEA
is consistently pursuing local management to iron out these issues and expects
a favorable resolution soon. He also noted that cashless hospital tie-ups
across all BAs and OAs are being monitored on a weekly basis, and the proposal
to lease out BSNL’s vast properties for sustained revenue generation instead of
selling them outright has been forcefully placed before the BSNL Board in New
Delhi with positive traction.
The General Secretary concluded by
expressing his deep gratitude for the spontaneous, massive turnout of members
throughout the two days of this joint Circle Executive Committee (CEC) meeting
in West Bengal and Kolkata Circles.
He remarked that the unified presence is
ultimate strength of SNEA. The address ended with a roaring commitment to
collective success, leaving the entire house electrified and highly confident.
Shri. Amit Khan, CP WB and Shri. Prasoon Ghosh, President,
SNEA Kolkata summarised the proceedings in Open Session, appealed all for strengthening
unity of executives under banner of SNEA and conveyed thanks to all.
Thereafter, Shri. M.S. Adasul, General Secretary,
gave patience hearing to thought process, feedback, suggestions, queries and doubts
by the members present in the house and replied each and every query/doubt to
the satisfaction of house.
The proceedings of the meeting were
nicely anchored by Shri Amit Khan CP WB.
The proceedings of CEC Meeting started
at 0100 Hrs concluded at 1800 Hrs with slogans of Unity and National Anthem. PHOTO
<<<>>
SNEA Meeting with Smt. Ghazala Faisal,
CGMT WB/KolTD: After conclusion of joint CEC Meeting of
SNEA KolTD & WB Circles, the delegation of the prominent SNEA leaders from
SNEA WB & Kolkata TD viz. Shri. Somenath Gosh, CS WB Circle and Shri.
Harekrishna Fauzdar, Circle Secretary, SNEA Kolkata, along with Shri.
Anup Mukharji, Joint Secretary East CHQ and Shri. M. S. Adasul, GS
SNEA had a meeting with Smt. Ghazala Faisal, CGMT WB & Kolkata
Circles on 12/06/2026 in her chamber.
We discussed important HR issues of BSNL
Executives of both the Circles, issues faced in overall development of BSNL in
these Circles and suggestions for providing fault free services to esteemed
customers of BSNL.
Many critical issued were discussed in
depth and CGMT has assured for resolution of all such issues. These discussions
were fruit and many concerns raised SNEA were responded positively and
affirmatively by CGM WB/Kol TD Circle.
In conclusion, team SNEA conveyed thanks
for spring time and fruitful discussions thereof and CGMT WB/Kol TD assured for looking
into concern and issues raised by delegation. PHOTO
<<<>>
AGM CSS BSNL CO writes to Circe Heads endorsing
Vigilance Section directions to prepare list of employees who have not
submitted Immovable Property Returns (IPRO) for the year 2025 and intimating
about action taken against such for not filing the said IPRO and to check cases
of ghost employees. Copy<<<>>
AGM Pers BSNL CO writes to the all Circle
heads for sending information required for confirmation of MTs. Copy<<<>>
SNEA has taken up matter for promotion of MTs
and it has been assured for the AGM Promotion of MTs after their confirmation
in MT Cadre.
DGM Rstg BSNL CO writes to all Circle Heads
regarding Correction of Job Roles in IPMS for Q1(2026-27) Performance
assessment for Automation of KPI Achievement Assessment in IPMS. Copy<<<>>
Status
of Report by the Committee Constituted for HR issues having some Financial
Impact: SNEA has submitted the feedback to the Committee constituted on
02/06/2026 {COPY <<<>>} for
recommendations on settlement of HR issues of BSNL Executives having certain
financial impact and discussed these issues for different HR issues.
SNEA had meetings with Chairman and Members of the Committee and we have strongly put forward the need of consideration of these long pending issues and giving relief to BSNL Executives who are sufferers. The detailed submission by SNEA. Letter <<<>> Annex A <<<>> ANNEX B <<<>> Annex C <<<>> ANNEX D <<<>>
After different
rounds of deliberations and discussions for about three weeks, now this Committee has
submitted its report and the same will be formally approved by CMD BSNL
and then it may be taken for approval of BSNL Management Committee/Board.
We have
submitted a brief note on enhancement of Transport allowance also, but we were informed
that it may be decided separately. COPY <<<>>
Though the
final report of Committee has not been disclosed officially, it is understood
that Committee has recommended for
enhancement of SAB by some percent which is less than 1%, Enhancement of TA/DA for AGM and below level
officers at par with DGM and above level officers, restoration of frozen Basic
limit to current year etc. The exact details on recommendations of the
Committee will be shared as and when available.
We are
hopeful that the Committee has submitted the recommendations positively and
there will be some financial relief for BSNL Executives on these financial HR
issues which were not decided for many years and are being given consideration
now.
Update
on Hearing in JTO to SDE Seniority Court case at CAT Chandigarh: As
informed hearing in JTO seniority case for SDE promotions was scheduled today
and case was listed at Sr No. 5 and it came up for hearing at 1100 hrs.
From the
SNEA side Shri Pawan Meena, JSW CHQ and Shri Pankaj Chopra, CS HP were present in
the Court during hearing.
From
respondent BSNL the case was represented by a regular Advocate as nominated Senior Advocate could
not attend the hearing. Though there was a strong chance that arguments could
have taken place today.
But, today
nothing could happen as the advocate for respondent, BSNL, has requested for
next date quoting the inability of the Senior Advocate to present the case.
Hon. Court
directed to have timely hearing as there are chances that the double Beach at
CAT Chandigarh may discontinue and the Court wants to complete the hearing in
this case before that.
By special
mention that the case is being delayed since long, Hon'ble Court expressed
displeasure on such negligent approach with
remark that Court cannot wait for advocate to represent the case and
instructed all the counsels to be present in next hearing without fail and
given date within 15 days. As such chances for completing arguments in this
case in next or next to next hearing are more. Now the next of hearing is
scheduled on 15/07/2026. Hope for the best.
DGM Restg.
BSNL CO writes to all Circle Heads regarding Supplementary window for entering Q1(Apr2026
to Jun2026) IPMS KPI Targets with Edit facility for FY 2026-27. The window will
be remained opened till dated 03.07.2026 keeping in view the revised IPMS KPI
Targets in respect of CFA/CM vertical. Copy<<<>>
DGM Restg.
BSNL CO writes to all Circle Heads regarding Automation of KPI Achievement
Assessment in IPMS. Copy<<<>>
SNEA
CHQ writes to Director HR BSNL for looking into field level issues
by out of box proposal benefitting BSNL as well as executives working in the field
units by allowing flexible Five days working days pattern in field units. COPY <<<>>
SNEA CHQ writes to Director HR BSNL requesting intervention regarding
review of Restriction on Purchase of Medicines to one month under
Outdoor Medical Reimbursement Scheme and permitting all employees to purchase
medicines for the entire duration prescribed by the authorized medical
practitioner. COPY <<<>>

Stay Focused on Results, Not Rhetoric:
AN EARNEST APPEAL TO
ALL BELOVED EXECUTIVES OF BSNL
Dear Esteemed Executives in BSNL,
The membership change over window is open from 16/06/2026 and by
now about 13 days are passed and SNEA conveys sincere thanks and gratitude
to all beloved Executives in BSNL for your continued support to SNEA and
keeping the membership of SNEA at the highest among all Associations in BSNL.
As on today, the Membership of SNEA (12750) is higher than the
combined membership of others (11500) and remaining being non-members of any
association. This great and grand support of esteemed executives in BSNL really remember us about our highest responsibility
to represent the aspirations and
safeguard the interests of BSNL
Executives and delivering continued positive results.
At this important juncture, we earnestly appeal to every executive of
BSNL to assess associations not by social media campaigns, allegations, or
emotional narratives, but by their credibility, achievements, approach,
and ability to deliver tangible results.
SNEA Believes in Positive and Constructive Association
activities: SNEA firmly
believes that every association in BSNL exists for one and common objective
i.e. The welfare and advancement of BSNL Executives.
For this reason, SNEA has consciously avoided engaging in
unnecessary controversy or personal attacks to leaders of any association.
Our energy has always been invested in continuous dialogue with BSNL
Management, DoT, DPE and the Government of India for securing long-pending HR
issues. SNEA has consistently chosen the path of constructive engagement and result-oriented
negotiations.
While every association in BSNL works in the similar approach, only
AIGETOA leadership has chosen the path of non-constructive criticism with
baseless allegations targeting SNEA, the only Recognised Majority Association
in BSNL chosen by you all beloved
executives in BSNL. AIGETOA leadership want to dictate terms and want SNEA to
move as per their wish and will, which is not and cannot be agreed by SNEA.
This is the reason for their frustration and they express it with regular criticism
with fake narratives as if nothing positive is happened in the 3rd
MV Tenure as Recognised Majority Association while factual position is
different and SNEA achievements during this period speaks volumes.
Results by SNEA, Speaks Louder Than Words: It is fact that SNEA has successfully pursued and achieved solutions
for several long-pending HR issues of BSNL Executives. It is important that
many of these issues are long pending and were declared closed /dead by
Management and with silent concurrence of then MA crying foul now. The list of issues
resolved by SNEA in favour of BSNL Executives includes:
1. Laptop Policy
for all Executives, including JTOs and JAOs.
2. Enhancement of
Mobile Handset Reimbursement Amount.
3. Approval of
Sabbatical Leave for all Executives.
4. Lifting of
restrictions on Deputation to Govt Depts. & other PSUs.
5. Career
Progression opportunities for Internal Talent.
6. Restoration of
Internal MT Recruitment by overcoming court hurdles.
7. Opposed
External MTs and continued Oppose to SET Recruitment
8. Promotions
across multiple cadres wherever legal impediments were absent.
9. Continuous
efforts for resolution of promotion-related court cases.
10. Notional
Fixation for SDE to AGM T Promotions for left out cases of 2018 Promotions
11.
Preparations
of up to date AIELs for JTOs/JAOs
12. Clear Stand on
Reservation Policy and its successful persuasion by getting promotions order
issued to best possible extent.
13.
Introduction
of e rosters in BSNL.
14. Implementation
of additional 4 Days Special CL for PwBD Executives which was pending since
2012.
15. Implementation
of PwBD reservations with Retrospective date starting with AGM T promotions
16.
Restoration of
Association facilities withdrawn earlier.
17. Strengthening
Executive-Employee unity under the AUAB platform.
18. Persistent
representation before BSNL, DoT, DPE and Government on all major HR issues.
19. Resolution of
majority of issues related to EPF higher pension Option.
20.
Online
Processing of Rule 8/9 Request Transfers
21.
Restoration of
process for Recruitment of JTOs.
22. Successful
Home return/Ghar Wapsay of Executives from CSS cadre who were forcefully sent
to BSNL Corporate office during previous MA tenure.
23. Successful
Settlement of issues created due to IPMS Implementation
24. Successful
Settlement of issues created due to Online Attendance
25.
Online Booking
of IQs
26.
GTI/GHI at better
negotiated rates.
27.
Stopped GHI
Policy at higher rates with alternative GHI Policy
28.
Restoration of
Second Saturday.
29. Persuasion of Pay
loss issue though Court and case listed for final hearing.
30. Persuasion of
E5 to E7 Pay Scale up gradation though Court and case listed for final hearing.
31. Stopping
writing Digital Diary in APP
32.
Withdrawal of
linking writing daily with daily attendance and monthly Salary.
33.
Written
assurance for restoration of Basic plus DA Limit for medical reimbursement to
April of Current Financial Year.
34. Constitution
of Committee for enhancement of SAB Contribution, TA/DA Rates and restoration
Medical reimbursement amount and regular persuasion with due feedback to
Committee for submission of its report.
35. Successfully
convinced Management for enhancement of Transport Allowance and proposal
submitted is under review of the Management
36. Administrative
approval for Constitution of Benevolent fund for BSNL Executives.
37. Long awaited
SDE Promotions of JTOs in Civil and Electrical wing
38. Office
Accommodations to Recognised Associations at CHQ/Circle and BA Level
39. Settlement of
welfare claims of lakhs of rupees from the monthly subscriptions of members.
40. Giving final
shape to proposal of one PSU One Association which is awaiting approval from
CMD BSNL
41. Principle
agreement on Change over from SPS to NPS awaiting approval of BSNL board
subject to corrections for either SPS or NPS.
42.
Concrete
actions to have own Management of BSNL
43. Reducing Long
stay Inter Circle transfers and making it need base
44.
Excluding
Female Executives from Inter Circle Long stay Transfers
45. Incorporating
changes required in OTP ESS Portal and Policy
46. Settlement of
long pending SDE Reversal issue with justice to affected Executives which was
litigated since 2007 with contradicting decisions by different courts.
47. Successfully
clearing hurdles created in IDA Payments to its root cause by persuasion at
DPE, DoT and BSNL.
48. Strong
advocacy for implementation of 3rd PRC before VRS proposal.
49. Break though
on the long pending demand of upgraded Standard pay Scales with sole focus on
affected Executives in BSNL.
50. Strong push to
demand of Third PRC Implementation in BSNL from deadlock at 2019 to concrete
forward actions in 2026 taking this issue with DoT with fresh and positive recommendation
of BSNL management.
51. Persuasion on
NCOA platform for constitution 4th PRC and also for removal of Affordability Clause in 4th
PRC
These are the classic examples of result of focused persuasion of SNEA
and list includes many more achievements of SNEA. These achievements are not just
promises but they are documented outcomes of sustained efforts of SNEA as
Majority association in support of Five Star Alliance and you all have
witnessed it.
Our Present Approach is solution oriented & different from
Traditional Approach: Experience
has shown that confrontation alone cannot resolve complex policy matters
involving BSNL, DoT, DPE and the Government. With this clear understanding, SNEA adopted a strategy
of Continuous dialogue, Well-documented representations, Professional
negotiations, Strategic advocacy and flexibility in approach, need base organizational/agitational actions. This approach has reopened several
HR issues that had earlier been declared closed and has brought many of them to
the threshold of resolution.
Let Facts
Guide Your Decision: During this
membership changeover window and one month before it, many statements, claims and allegations are circulating
on various platforms only by AIGETOA leaders. We respectfully appeal to
every executive to verify facts before believing allegations, Compare
achievements rather than rhetoric, Judge associations by their performance, not
by propaganda, Support those who consistently work for collective welfare. A mature and responsible Executive community deserves informed
decisions based on evidence.
SNEA Accepts Both Credit and Responsibility: As the
Recognised Majority Association with 52% historical votes in support of Five
Star Alliance with SEWA, CBOWA, DEWAB, AIBSNLOA in third Membership
verification, SNEA has never
hesitated to take responsibility. Where we have achieved progress, we
acknowledge it with togetherness and humility and where the issues remain
pending, we continue to pursue them with equal commitment and we also accept
responsibility of pending issues and failures if any. Our responsibility does
not end with raising slogans, it begins with delivering solutions. SNEA has
decided not to respond to this traditional blame game by our young brothers and
leaders of AIGETOA and keep the focus only on continued efforts for resolution
of HR issues of BSNL Executives.
Our
Commitment for the Future: SNEA
remains fully committed to securing, Upgraded Standard Pay Scales for affected
executives in BSNL, Implementation of 3rd PRC without further delay, Promotions across all cadres and wings by
overcoming the hurdles due to court cases, Resolution of all pending
court-related HR issues, Protection of
interests of BSNL Executive. a stronger, professionally respected BSNL
Executive fraternity and every pending HR issue remains on our agenda until it
reaches its logical conclusion. SNEA is Committed to Service, Committed to Results, Committed to Every BSNL
Executive as SNEA focuses on its achievements, maintains a professional and
dignified tone suitable for publication, ends with a strong, positive appeal to
executives and navigating challenges, mistakes, and feedback with an open,
mission-focused mindset, rather than reacting out of ego, fear, or a need to
prove oneself infallible.
A Humble Appeal to Dear Esteemed Executives of beloved BSNL: Your
preference and option to the Membership of Association is not merely a choice between associations
but it is a choice between approaches, its choice for constructive dialogue
over confrontation, support to documented achievements over repeated
allegations, support to responsible leadership over temporary rhetoric, to
choose an association that believes in unity, professionalism and results.
SNEA expresses sincere gratitude for the trust reposed by BSNL
Executives over the years and assures every executive in general and SNEA
member in particular that we shall continue to work with honesty, transparency
and unwavering commitment towards BSNL Executives across all wings and cadres.
We earnestly appeal all members to continue its support and non-members
to opt for SNEA and strengthen the unity of BSNL Executives under banner of
SNEA, the only Recognised Majority Association in BSNL and to continue its sincere and devoted efforts as
unanimous voice of BSNL Executives.
By accepting and continuation membership of SNEA, please strengthen the devoted efforts of SNEA and give us strength so that we will
be successful in getting orders for due promotions across all wings and cadres during this year itself, approval of upgraded standard Pay scales for affected Executives, Enhancement in SAB Contribution for all
BSNL recruited Executives and implementing third PRC
for all BSNL Executives etc.
Please join SNEA in mass and
strengthen the Unity of BSNL Executives.
SNEA Zindabad, Executives’ Unity Zindabad,
BSNL Zindabad !!!.
One Step forward for appointment of
Regular CMD BSNL: DoT issued notification for appointment of
CMD BSNL on immediate absorption basis through Search cum selection Committee
and last date for submission of application is 22/07/2026. COPY <<<>>
Vacancy for post of CMD BSNL was created on
15/07/2024 due to on-extension of term of then CMD BSNL Shri P. K. Purwar and
since last two years the charge of CMD BSNL including MTNL, BBNL has been entrusted
to Shri A. Robert J. Ravi as additional Charge and recently it has been
extended till 15/10/2026. COPY <<<>>
Earlier PESB has issued notification for Appointment
of CMD BSNL COPY <<<>> , but none of the applicants including some Directors of present BSNL
Board were found suitable for the post of CMD BSNL.
Hence on 22/07/2025, as per approval of
ACC, DoT has issued directions for appointment of CMD BSNL by constitution of
Search Cum Selection Committee headed by Chairman PSEB COPY <<<>> and this notification is issued after a period of one year.
With this search Cum Selection Committee
also the selection will be done by the Committee out of the applications
received by Secretary DoT till the last date of submission of applications.
With this formal notification by DoT, the chances
of appointment of Regular CMD BSNL are enhanced and BSNL may get regular CMD
BSNL though this special process under Search Cum Selection Committee
constituted as per DoPT Guidelines. COPY <<<>>
Apart from the post of CMD BSNL, PESB has
already issued notification for post of Director CM BSNL COPY <<<>> and Director CFA BSNL COPY <<<>> , but even after completion of six months of receiving nominations by
PESB, but till no interview has been conducted for any of this posts.
It is understood that there is a proposal
for restructuring of the BSNL Board with rearrangement of the portfolios,
responsibilities and designations of Directors and hence there is delay.



Circle Web site Links